The floors go in last.
Prehung door before or after finished floor.
Baseboard goes down then the 2nd coat of paint goes on.
After floors are in fenish with quarter round shoe molding.
On a professional job all the doors are hung first then cased.
There will almost certainly be trimming involved for other floors on the jamb and possibly the door too.
It also assures that the doors on hand are correct and will work.
What i am looking to do is shim up the jamb to the desired height so that i will have 1 2 after carpet is installed and won t have to cut the doors.
Adjust the gap around the door and let the other side jam.
This is for timing.
Im only asking because if.
The last thing i want is the flooring crew to undercut my jambs remove the doors from their hinges and risk dmaging them or adding an unexpected bump in the flooring which takes me coming back to pull the door.
This clearance is set by trimming the ends of the hinge and latch jambs.
I set the prehung unit and then remove the door until after carpet.
Which project goest first.
The clearance between the bottom of the door and the finish floor should be 3 8 inch or less.
Set the hinge side of doors 1 2 off floor to tuck in carpet.
Before the floors go in you can easily shim one end of the jamb to get the door exactly plumb.
Then the flooring installers come in and do their thing.
So i need to buy new prehung interior doors.
Door first means the trimwork can be more complete while the crew is set up onsite.
Just be sure to allow for a threshold or thick carpeting before making these cuts.
Also maybe others are more careful but i found it s hard not to ding the floor a little bit when doing doors afterwards.
I am gutting out the house and one project leads to another.
You should hang all doors and trim after dry wall.
You can rent a saw that is special made for cutting door casings to allow tyle to go under.
I removed old wood walls and putt in new drywall and so now the door frame is off balance with the wall.
Then you should paint all trim and doors first then ceiling and walls.
Most builders leave the floors for last.
After floors this would be a huge pain to do since you would need to pull the door out and saw the jamb.
But i also have to tile the floor.
Best method for carpeted floors where minor variations won t show.